DN1200 tray installation installation in a trenchless manner, Klaipeda
Client: AB Kauno dujotiekio statyba
Installation of pallets with steel pipe DN1200mm, L-173m, 5 pcs., At the object “Construction of Klaipėda-Kuršėnai DN800 main gas pipeline”.



Client: AB Kauno dujotiekio statyba
Installation of pallets with steel pipe DN1200mm, L-173m, 5 pcs., At the object “Construction of Klaipėda-Kuršėnai DN800 main gas pipeline”.