Installation of Nordbalt project DN315 cable protection cases by trenchless method, Klaipeda
Client: UAB Kauno tiltai
Klaipėda “Nordbalt submarine cable connection. Construction of an underground cable in the territory of Lithuania ”, closed transitions when installing trays by e. for cables with PE DN315 pipe, L-4600m