HORIZONTAL DIRECTIONAL DRILLING

Installation of D630 and D400 PE pipes using the directional drilling method in the territory of Kaunas Clinics.

New construction project for a medical building at Eivenių g. 2, Kaunas.

Total drilling lengths D630 – 181m, D400 – 36m

Client: UAB Skaitel