Installation of D630 and D400 PE pipes using the directional drilling method in the territory of Kaunas Clinics.
New construction project for a medical building at Eivenių g. 2, Kaunas.
Total drilling lengths D630 – 181m, D400 – 36m
Client: UAB Skaitel