HORIZONTAL DIRECTIONAL DRILLING

Installation of a DN450 water supply culvert from the Kleboniškis waterworks across the Neris River in Kaunas.

Reconstruction project of the water supply network from Kleboniškis waterworks across the Neris River to Panerių g., Kaunas city, Kaunas.
DN450 360m long water supply culvert was installed using the directional drilling method.

Client: UAB Kauno vandenys