HORIZONTAL DIRECTIONAL DRILLING

Installation of a closed crossing under the Nemunas River in Alytus with PE DN400 pipe

Client: UAB Inžineriniai tinklai

Installation of a closed crossing under the Nemunas River in Alytus with PE DN400 pipe, L-195m