Installation of carbon DN500 liner from thermal chamber 92421 to 92422, under Naujininkai bridge, Švitrigailos street, Vilnius
Two DN500 heat supply pipes each 95m. renovation using the CIPP method using a carbon “sleeve”.
Renovation of heat supply pipelines using the CIPP method is an absolute novelty in the world. There have only been six previous installations using this material and all of them were in the product development phase.
Client: AB Vilniaus šilumos tinklai